Customization: | Available |
---|---|
Media: | Water |
Material: | PVC/UPVC/Plastic |
Still deciding? Get samples of US$ 0/Piece
Request Sample
|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
NO. | Part | Material |
1 | Body | PVC |
2 | Seat Seal | TPE/TPV/EPDM |
3 | O-Ring | EPDM/NBR |
4 | Ball | PP/PVC |
5 | Handle | PP/ABS/PVC |
6 | Cap | PP/ABS/PVC |
SIZE | Socket End | Thd./in | ||||||
DIN | ANSI | BS | ||||||
inch | d1 | d2 | d1 | d2 | d1 | d2 | NPT | BSPT |
1/2" | 20 | 20.3 | 21.23 | 21.54 | 21.3 | 21.5 | 14 | 14 |
3/4" | 25 | 25.3 | 26.57 | 26.87 | 26.7 | 26.9 | 14 | 14 |
1" | 32 | 32.3 | 33.27 | 33.65 | 33.5 | 33.7 | 11.5 | 11 |
1-1/4" | 40 | 40.3 | 42.04 | 42.42 | 42 | 42.2 | 11.5 | 11 |
1-1/2" | 50 | 50.3 | 48.11 | 48.56 | 48.2 | 48.4 | 11.5 | 11 |
2" | 63 | 63.3 | 60.17 | 60.63 | 60.3 | 60.5 | 11.5 | 11 |
2-1/2" | 75 | 75.3 | 72.85 | 73.38 | 75.1 | 75.3 | 8 | 11 |
3" | 90 | 90.3 | 88.7 | 89.31 | 88.8 | 89.1 | 8 | 11 |
4" | 110 | 110.4 | 114.07 | 114.76 | 114.2 | 114.5 | 8 | 11 |
1 | Standard | ANSI, DIN, BS |
2 | End Connection Type | Socket end or Thread end |
3 | Size | 1/2"-4" (20mm-110mm) |
4 | Color | White, Grey, Blue |
5 | Working Pressure | PN10/10kgs/150psi |
6 | Working Temperature | -10ºC - 50ºC |
7 | Applications | Water supply, Irrigation, Pools building, etc. |
FAQ: (Frequently Asked Questions)
1. What is your MOQ?
Our MOQ is usually 10 cartons of each size.
2. What is your delievery time?
Our delievery is about 30-45days.
3. What is your payment terms?
We accept T/T, 100% L/C, or West Union and so on.
4. Could you provide free samples?
Usually we offer free samples, customer bear the freight cost.
5.Are you a trading company or a factory?
We are a foreign trade company, but we have a very complete supply chain and can easily find products that suit you.
6. Why choose us?
Firstly, comparing with many factories, our prices are more competitive.
Secondly, We 100% test working pressure for ALL our products, and we inspect 5 times every order.
1) Inspect when the ball valves come out from the injection molding machine
2) Inspect when adding O-rings
3) Inspect when installing handle caps
4) Inspect after working pressure test
5) Inspect before packing
Finally, After- Services will be highly-satisfied. Any problems and feedbacks will be responsed efficiently.